Construction of the underground new building of the Museum and refurbishment of the actual palace. The project features exhibition halls, a 170 seats auditorium fully equipped, laboratories, cafeteria, library, training Center.
The new Museum will be equipped with an emergency power plant 1,200 KVA capacity, and the latest technology in humidity control, audiovisual equipment, access control, CCTV, anti-intrusion devices, fire-fighting, fire-alarm, all connected to state-of-the-art BMS control system. Total built area is 8,500 m2.